Project Size
±433,000 RSF, 25 stories

Construction
Scheduled to open 2nd Quarter 2009

Property Management
On-site by Tsakopoulos Investments

Floor Size

1st Floor: ± 14,400 RSF, Lobby, Retail/Office
2nd-4th Floors: ± 10,600 - 11,200 RSF
5th-8th Floors: ± 6,600 RSF
9th-23rd Floors: ± 22,100 - 23,700 RSF
24th Floor: ±17,500 RSF
25th Floor: ±11,000 RSF
Penthouse ±6,000 RSF

Expense Stop
Base Year

Parking
1 space per 500 square feet

Elevators
Four high-speed elevators servicing Lobby and floors 15 through 26; Four high-speed elevators servicing Lobby through floor 15, Two elevators servicing Lobby Level through all garage levels, One freight elevator providing service to all floors.

Exterior
Granite with precast panels

Fire & Life Safety
Multiplex system with expansion capabilities

Structure
Steel Frame

Bay Depth
Ranges from 30 -40 feet average

Ceiling Height
9 feet

HVAC
Cooling for the building will be provided by centrifugal water chillers. A central HVAC plant will distribute conditioned air to a floor duct loop and provide conditioned air to the direct digital controlled variable volume terminal boxes and ceiling air diffusers. The system will be completed by an economizer to allow outside air cooling whenever possible.

Electrical Service
Building service is 4,000 amps provided by the Sacramento Municipal Utility District. Power to each floor will be served from electrical closets on each floor. Each closet will have one lighting panel, as well as 120/208 volt branch circuit convenience load panels.

Security System
Building and parking garage will be accessible by after hours security access cards. Security personnel will be posted 24-hours a day, seven days a week.

Fiber Optics
Multi fiber optic server provider capability to the building.